close

We Are Open 24 Hours a Day, 7 Days a Week, Including Weekends and Public Holidays.

FRP Waste Gas Purification Tower

Applications​​:Utility-scale solar farms:​​ Module-level access for O&M ​​Commercial rooftops:​​ OSHA-compliant maintenance paths ​​Floating PV systems:​​ Corrosion-resistant versions ​​BIPV projects:​​ Architectural-grade finishes
Product PDF
Product information
Tags

​1.Keywords:

 

Acid Gas Scrubber, Chemical Fume Purifier, VOC Removal Tower, Packed Bed Scrubber, Wet Scrubber System, Alkaline Waste Gas Treatment, Acid Mist Collector, Odor Control Tower, Industrial Air Pollution Control, Multi-Stage Scrubber, PP Plastic Scrubber, FRP Exhaust Tower

 

​​2.Technical Specifications​

​1. Core Parameters​

​Parameter​

​Specification​

Treatment Efficiency

95-99.9% (gas dependent)

Pressure Drop

500-1500 Pa

Liquid-Gas Ratio

1-3 L/m³

Temperature Range

-20°C to +120°C

Material Options

PP, FRP, PVDF, 316L SS

2. Contaminant Removal Capability​

​Pollutant Type​

​Removal Rate​

​Absorbent Used​

HCl/SOₓ/NOₓ

>99%

NaOH/Ca(OH)₂

NH₃

98%

H₂SO₄ Solution

Organic VOCs

90-97%

Activated Carbon + Oxidants

Particulates

95% (PM2.5)

Water Mist

​​3.Design Features​

1. Advanced Contact Systems​

​Packed Bed Design​​:

Φ25-50mm PP Pall Rings (specific surface 220m²/m³)

3-stage countercurrent washing (pH control in each stage)

    •  

​Venturi Scrubber Option​​:

Gas velocity 60-120 m/s for submicron particles

  •  

​2. Smart Control​

​Automated Dosing System​​:

ORP/pH sensors with PLC-controlled chemical injection

    •  

​Mist Elimination​​:

Chevron-type demister (99.9% liquid droplet capture)

  •  

​3. Structural Advantages​

Modular Construction​​:

Flanged connections for easy field assembly

    •  

​Corrosion Protection​​:

3mm thick PP lining with fiberglass reinforcement

  •  

​​4.Industry Applications​

A. Semiconductor Industry​

​Specialty Gases​​: HF/HCl/Cl₂ removal

​Ultra-Clean Design​​: ISO Class 5 compliant

  •  

​B. Waste Incineration​

​Acid Gas Control​​: Dual-stage (alkaline + carbon adsorption)

Heat Recovery​​: Integrated flue gas condenser

  •  

​C. Pharmaceutical​

​Solvent Recovery​​: Teflon-coated packing for VOC condensation

  •  

​​5.Performance Validation​

  •  

​Field Test Data​​:

99.2% HCl removal @ 5000ppm inlet (EPA Method 26A)

87% THC reduction in paint booth exhaust

    •  

​Certifications​​:

CE PED 2014/68/EU (Pressure Equipment)

ATEX Zone 2 (Explosion Protection)

  •  

​Custom Options​​:

✓ Explosion-proof motor packages

✓ Remote IoT monitoring (4-20mA/Modbus)

✓ Sludge dewatering system integration

What Our Customers Say About Us

Welcome To Tell Us Your Needs
Welcome To
Tell Us Your Needs
Welcome friends and customers at home and abroad to cooperate
sincerely and create brilliance together!
Can't Find The Products And Services You Need?
Can't Find The Products And Services You Need?
If you need our help,
Our staff will be happy to help and answer your questions!
 Factory Processing
Factory Processing
The factory processes raw materials into finished products using advanced machinery and skilled labor.
 Build Synergy
Build Synergy
We provide collaborative services tailored to client needs, ensuring seamless communication and mutual growth.
 Global Supply
Global Supply
Our innovative products are bestsellers worldwide, celebrated for their exceptional quality, reliability, and global appeal.
 Global Supply
Global Supply
We ensure consistent product availability through a reliable and efficient global supply network.

Address

20 Xingyuan South Street, Zaoqiang County, Hengshui City, Hebei Province, China

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.